WRKACTJOB does not include low-level system tasks. If you have Performance Tools installed (5722PT1), you can see tasks with WRKSYSACT.
WRKACTJOB does not include low-level system tasks. If you have Performance Tools installed (5722PT1), you can see tasks with WRKSYSACT.
You can also see the tasks if you have installed the Work with System Activity II software
I did WRKACTJOB and sorted the jobs by CPU% column. Individual Jobs CPU% do not add up to the total CPU% value shown at the top left corner of the screen. Can anyone clarify? Thanks a lot. Srini
That still won't get it for you... you'll have to set up a monitor in iSeries Navigator to really see it. I am having issues hitting my "interactive threshold"... all my interactive jobs are shifted to priority 89 - in both WRKACTJOB and WRKSYSACT I couldn't see where my interactive jobs were adding up to the 15.8% maximum I was allowed. I was able to create a monitor in Navigator where I could see it graphically over time. Actually, IBM did this to convince me that I was exceeding my interactive capability... I'm still not convinced...