Sidebar

Getting to Know the New LPAR Worksheet

IT Infrastructure - Other
Typography
  • Smaller Small Medium Big Bigger
  • Default Helvetica Segoe Georgia Times

With V4R4, your multiprocessor AS/400 server is capable of using Logical Partitioning (LPAR), the ability to make one multiprocessor server (any 6xx, 7xx, 8xx, or Sxx server) run as if it were two or more servers. This is accomplished by dividing the hardware resources into a primary partition and one or more secondary partitions. The primary partition acts as the “parent” partition and can perform administrative functions on the secondary partitions.

You can take a server and essentially divide it into two or more independent systems, all residing on the same AS/400. This not only reduces the amount of necessary server space but also helps you maintain a separation between the various types of systems. For instance, you can put a development server and a production server into one AS/400 but keep them in separate partitions so that a failure in one partition will not affect the other. (However, failures in the primary partition will bring down all other partitions, since the primary partition performs administrative functions over the secondary partitions.)

For more information about LPAR, see the Logical Partitions section under the System Administration, Availability, and Maintenance heading on the IBM AS/400 Information Center Web site (www.as400. ibm.com/infocenter).

The actual creation and administration of a partitioned server is fairly easy and straightforward: You treat each partition as if it were a separate server. Planning for LPAR, however, can be a complex and lengthy process. Because of this fact, IBM has provided the AS/400 Logical Partitions Configuration Planning Worksheet on its Logical Partitioning Web site (www.as400.ibm.com/lpar), which will guide you and your Business Partner (BP) or marketing representative through the necessary steps to getting all the hardware resources you need to create partitions on your AS/400 server. You may want to view this worksheet as you read this article to help you understand what’s being discussed.

Although the worksheet has been around since V4R4, it has recently undergone a significant change, making planning and implementation easier and more accurate. The purpose of this article is to acquaint you with the worksheet and the process of planning for LPAR on your AS/400.

The Worksheet, New and Improved

Originally, the AS/400 Logical Partitions Configuration Planning Worksheet was part of the AS/400 Logical Partitions Hardware Reference Guide, a manual of about 60 pages. It


took a lot of time to get through and required significant hardware knowledge to successfully complete. In late January, IBM released the new version of the worksheet, which features a shorter (15 pages) guide for completing the worksheet and more detailed instructions and processes. This was the result of the increased demand for LPAR, specifically for hardware validation of proposed configurations. The new version of the worksheet does not require a lot of reading on your part. It can be downloaded as a Lotus WordPro or Microsoft Word document or viewed and printed online; the guide for completing the worksheet can be downloaded or viewed separately as well.

The main change to the worksheet is the solidification of the planning process, which involves four steps. These steps are included in three separate sections in the worksheet:

• Section 1 lets customers record the hardware resource requirements for the partitioned system.

• Section 2 involves entering hardware resource information into one of the AS/400 configurators by a BP or marketing representative.

• Section 3 lets the BP or marketing representative create a system schematic and fill in additional hardware information for the partitions, which is then sent in to IBM for validation along with the configurator output.

Another significant addition to the worksheet is the requirement of a system schematic. The basic schematics for 7xx and 8xx servers and expansion units are included in the worksheet. Those who want to do LPAR on a 6xx or Sxx server can use the 7xx server equivalent (720 for 620 or S20; 730 for 640 or S30; or 740 for 650 or S40). The schematic is a great way to visualize how the system will be set up and helps to make each configuration more accurate.

What It Means to Customers

What does all of this change mean to you, the person planning to implement LPAR? It means that you need to do a little decision-making and planning (but less than what was required with the previous version of the worksheet). It also means that you can define the requirements that your BP or marketing representative can use, allowing you to determine which server best fits your needs; otherwise, you can follow the process used in the previous version of the worksheet, determining the server first, then defining your requirements for each partition.

What It Means to BPs and Marketing Reps

The new worksheet formalizes the process that many of you BPs and marketing representatives have already gone through in creating LPAR solutions for your customers. It logically organizes the information, making it easier to create configurations based on your customers’ needs. You can complete the worksheet either solely (with some basic customer information) or by working closely with your customers before sending it in to IBM for validation.

It may also be beneficial for you to create a few basic configurations and hand out the worksheet to your customers. This could speed up the process of completing the worksheet and help your customers decide how to implement partitions for their businesses.

Steps for the Customer

Before diving into the worksheet, it would be helpful for you to learn a few things up front and make a couple of decisions about how you want to implement the partitions. Although


these concerns are beyond the scope of this article, you should understand the basics contained in the Learning about logical partitions section of the Information Center (www.as400.ibm.com/infocenter) I mentioned.

Preliminary Planning

The most important choices to make at this point are whether to use bus-level or input/output processor-level (IOP-level) partitioning, whether or not to use hardware and device switching between partitions, and whether to upgrade an existing server or order a new server to support LPAR. After you have made these decisions, you can better determine how many partitions you want on the server. The number of partitions you need depends on your business needs and how much separation you want. (Currently, you cannot have more than 24 partitions on a single server, since each partition must have at least one processor assigned to it. No LPAR-capable server has more than 24 processors.) Next, you should perform capacity planning for each partition to determine your basic resource requirements.

After you do this preliminary planning, you will find it much easier to complete Section 1 of the worksheet. It will also help you to get the right system for your needs.

Completing Section 1

You start off the worksheet by defining your hardware requirements for each partition. If you need more than six partitions, you can just add rows to the table. You may notice right away that the partitions are numbered, starting with 0. Although it can be confusing at first, this convention helps you to remember that partition 0 is the primary partition and that it is different from the secondary partitions.

Use the Capacity Planning Study

After specifying the names for each partition, you are ready to define the requirements for each partition. I found it easier to take the information from the Capacity Planning study obtained through IBM Global Services and go through each partition individually before moving on to the next. This was mostly because I hadn’t picked a specific system first, and I just wanted to get all the information so that I could determine what kind of system I needed. If you already know what server you want, it would be useful to complete some of the columns of information (e.g., defining the amount of interactive performance and making sure the total does not exceed what the selected server currently supports).

You’ll need to specify total performance (Commercial Processing Workload, or CPW) and interactive performance. The AS/400 Logical Partitions Hardware Reference Guide (www.as400.ibm.com/lpar/plan.htm) contains tables that show the possible system CPW and interactive performance for each system.

For the disk capacity information, you need to specify the total capacity that you require in each partition. Using parity protection (RAID) or mirroring will reduce the usable amount of disk capacity, but you should still provide the total amount you require, not the total of what will be usable.

Include Hardware Device Requirements

Next, specify what other hardware you need in each partition. You need to have at least one tape device and one CD-ROM drive for the primary partition. If you are hardware switching, you need one of each of these devices for the secondary partitions involved in the switching. Secondary partitions that do not participate in switching need one of each device. You must also have at least one console for each partition. You should indicate the amount of a particular hardware resource you need (e.g., two CD-ROMs per partition). Be sure to add the total at the bottom of the worksheet. At this point, all you need to know is what types of hardware you want and how many of each you need. You don’t need to have


a specific device in mind, although if you do, give this information to your BP or marketing representative for completing Sections 2 and 3 of the worksheet.

Enter General Hardware Information

The final part of Section 1 involves completing a table of general information about the partitions. You need to specify:

• The type of console you would like for each partition (twinax workstation or Operations Console)—Operations Console provides a graphical interface for working with a server. Currently, however, there is no specific support for LPAR in Operations Console. You will still have to use dedicated service tools (DST) to configure and manage your partitions and resources.

• Whether or not a partition should have Electronic Customer Support—Each partition can have its own Electronic Customer Support connection, or you could just have it in the primary partition and distribute PTFs and other information to the secondary partitions by other means. Whatever you choose, each partition with it needs a communications line and a modem.

• What disk unit size you prefer—This choice will vary depending on business needs.

• Whether to use mirroring or parity protection (RAID).

• What partition technology you prefer (SPD or PCI)—SPD technology is more flexible about hardware placement than PCI. IBM recommends PCI technology in general, but partitioned systems require a lot of extra IOPs, which may be better suited to SPD technology. Either technology will work, but you may need to make some adjustments depending on your choice. If you are unsure about what to answer here, contact your BP or marketing representative.

Your last task is to provide this information to your BP or marketing representative. You can either work together on the rest of the steps or let them take it from this point. If you are letting them take it from here, read the next section to learn what they will be doing.

Steps for the BP or Marketing Rep

Using the information gathered in Step 1, you should be able to determine what server is needed to fulfill all of the customer’s requirements. You will need to determine this before using the configurator (available from IBM’s Web site) to enter the information from Section 1 of the worksheet.

Use the Configurator

When you use the configurator for Section 2 of the worksheet, remember to specify feature code 0140 for each partition. This will check your proposed configuration for the necessary load source and console requirements. However, the configurator will not check against any other requirements, so it is up to you to make sure that all of the requirements are met.

If you are doing this for existing hardware, you should be able to get the existing configuration and download it into the configurator. Make sure you check the existing configuration against the actual hardware and correct any inconsistencies so that the most accurate record possible is used. In any case, the configurator will provide you with feature code information that you can use to complete Section 3. You have to provide the final version of this configuration output to IBM in either OUT or TXT format or Rich Text Format (RTF). IBM will not accept the CFR or WIP format for configurations.


Create a System Schematic

Section 3 of the worksheet requires you to create a schematic of the system that you wish to configure. First, you configure the number of processors, interactive performance, and main storage per partition. (You can get most of this information from Section 1.) To determine how many processors you need in a partition, you must first determine the amount of CPW available for each processor (total system CPW divided by total number of processors). Next, find the number of processors required in a partition (system CPW required in the partition divided by amount of CPW available for each processor). Take the result and round up to the next whole number. This is the number of processors that you must have in the partition.

You will also need to define the percentage of interactive performance needed for each partition. Take the interactive performance CPW required in the partition (defined in Step 1) and divide it by the total interactive performance CPW on the system. Multiply the result by 100 to get the required percentage. Since partitions must have a whole percentage number, you need to round up or down. This percentage will be used during the creation of the partitions. The interactive performance percentage cannot be less than 1.5 percent of the system CPW for the partition.

Finally, you need to specify whether or not each partition will use virtual OptiConnect for communication between partitions. Although this will not require additional hardware, it does require a license for either OptiConnect/400 or OptiMover for OS/400 software before it can be used.

Now you are ready to complete the schematic, using the pages from the worksheet. You should delete unused servers and expansion units and create duplicates for expansion units that will be used more than one time. To complete the schematic, use the latest version of the Redbook AS/400e System Handbook, along with the extra rules provided in the guide to completing the worksheet.

For the system and each expansion unit, be sure to indicate the bus number, which partition will own the bus (even if the bus is shared, one partition must be defined as the owner—this can be the primary partition if all buses will be shared), and whether the bus will be dedicated to the partition or shared with other partitions. If a bus is dedicated, all the IOPs and IOAs on the bus must be assigned to the partition that owns the bus. If a bus is shared, any partition can use any IOP and its IOAs. These two types of partitioning are known as bus-level and IOP-level partitioning, respectively. IOP-level partitioning is as low as you can get. You must assign all IOAs and devices on the IOP to a single partition. It is not possible to assign parts of an IOP to different partitions.

Enter Additional Hardware Placement Information

After you are done with the schematics, you will notice a section for additional hardware placement information. Use the tables in this section to provide specific information about the load source disk unit, the console, and the alternate IPL device, and to provide general information about the disk units. (This is an important part of Section 3.) You can verify the schematic and placement rules with what you enter here and show device switching more easily. The information in this section is for the services person who will move hardware resources to the appropriate places and get the system ready for partitions. Complete the tables for every partition that will be on the system.

Send Everything to IBM for Validation

Finally, you BPs and marketing representatives gather all of the information and send it to IBM for validation. You need to send the completed worksheet, the configuration report, and any additional information that you think IBM needs to validate the proposed configuration. This information can be sent either by fax or by email. Email is probably the best, since you can attach both the worksheet and the configuration file easily.


IBM validates the worksheet and sends it back to you, either with corrections or with approval. The BP or marketing representative can now update the configurator data and submit the order. You should keep the worksheet handy for setting up the hardware and the partitions.

Although a lot has changed with the worksheet, you should find it easier to follow and complete. This new worksheet will help you plan partitions quickly and get them on your system with fewer difficulties.

REFERENCES AND RELATED MATERIALS

• AS/400 Information Center Web site: www.as400.ibm.com/infocenter
• AS/400 Logical Partitions Hardware Reference Guide: www.as400.ibm.com/lpar/plan.htm
• AS/400e System Handbook, Redbook (GA19-5486-20)
• IBM Logical Partitioning Web Site: www.as400.ibm.com/lpar
• Slicing the AS/400 with Logical Partitioning: A How to Guide, Redbook (SG24-5439-
00)


BLOG COMMENTS POWERED BY DISQUS

LATEST COMMENTS

RESOURCE CENTER

  • WHITE PAPERS

  • WEBCAST

  • TRIAL SOFTWARE

  • Mobile Computing and the IBM i

    SB ASNA PPL 5450Mobile computing is rapidly maturing into a solid platform for delivering enterprise applications. Many IBM i shops today are realizing that integrating their IBM i with mobile applications is the fast path to improved business workflows, better customer relations, and more responsive business reporting.

    This ASNA whitepaper takes a look at mobile computing for the IBM i. It discusses the different ways mobile applications may be used within the enterprise and how ASNA products solve the challenges mobile presents. It also presents the case that you already have the mobile programming team your projects need: that team is your existing RPG development team!

    Get your copy today!

  • Automate IBM i Operations using Wireless Devices

    DDL SystemsDownload the technical whitepaper on MANAGING YOUR IBM i WIRELESSLY and (optionally) register to download an absolutely FREE software trail. This whitepaper provides an in-depth review of the native IBM i technology and ACO MONITOR's advanced two-way messaging features to remotely manage your IBM i while in or away from the office. Notify on-duty personnel of system events and remotely respond to complex problems (via your Smartphone) before they become critical-24/7. Problem solved!

    Order your copy here.

  • DR Strategy Guide from Maxava: Brand New Edition - now fully updated to include Cloud!

    SB Maxava PPL 5476PRACTICAL TOOLS TO IMPLEMENT DISASTER RECOVERY IN YOUR IBM i ENVIRONMENT

    CLOUD VS. ON-PREMISE?
    - COMPREHENSIVE CHECKLISTS
    - RISK COST CALCULATIONS
    - BUSINESS CASE FRAMEWORK
    - DR SOLUTIONS OVERVIEW
    - RFP BUILDER
    Download your free copy of DR Strategy Guide for IBM i from Maxava today.

     

  • White Paper: Node.js for Enterprise IBM i Modernization

    SB Profound WP 5539

    If your business is thinking about modernizing your legacy IBM i (also known as AS/400 or iSeries) applications, you will want to read this white paper first!

    Download this paper and learn how Node.js can ensure that you:
    - Modernize on-time and budget - no more lengthy, costly, disruptive app rewrites!
    - Retain your IBM i systems of record
    - Find and hire new development talent
    - Integrate new Node.js applications with your existing RPG, Java, .Net, and PHP apps
    - Extend your IBM i capabilties to include Watson API, Cloud, and Internet of Things


    Read Node.js for Enterprise IBM i Modernization Now!

     

  • 2020 IBM i Marketplace Survey Results

    HelpSystems

    This year marks the sixth edition of the popular IBM i Marketplace Survey Results. Each year, HelpSystems sets out to gather data about how businesses use the IBM i platform and the IT initiatives it supports. Year over year, the survey has begun to reveal long-term trends that give insight into the future of this trusted technology.

    More than 500 IBM i users from around the globe participated in this year’s survey, and we’re so happy to share the results with you. We hope you’ll find the information interesting and useful as you evaluate your own IT projects.

  • AIX Security Basics eCourse

    Core Security

    With so many organizations depending on AIX day to day, ensuring proper security and configuration is critical to ensure the safety of your environment. Don’t let common threats put your critical AIX servers at risk. Avoid simple mistakes and start to build a long-term plan with this AIX Security eCourse. Enroll today to get easy to follow instructions on topics like:

    • Removing extraneous files
    • Patching systems efficiently
    • Setting and validating permissions
    • Managing service considerations
    • Getting overall visibility into your networks

     

  • Developer Kit: Making a Business Case for Modernization and Beyond

    Profound Logic Software, Inc.

    Having trouble getting management approval for modernization projects? The problem may be you're not speaking enough "business" to them.

    This Developer Kit provides you study-backed data and a ready-to-use business case template to help get your very next development project approved!

  • What to Do When Your AS/400 Talent Retires

    HelpSystemsIT managers hoping to find new IBM i talent are discovering that the pool of experienced RPG programmers and operators or administrators is small.

    This guide offers strategies and software suggestions to help you plan IT staffing and resources and smooth the transition after your AS/400 talent retires. Read on to learn:

    • Why IBM i skills depletion is a top concern
    • How leading organizations are coping
    • Where automation will make the biggest impact

     

  • IBM i Resources Retiring?

    SB HelpSystems WC GenericLet’s face it: IBM i experts and RPG programmers are retiring from the workforce. Are you prepared to handle their departure?
    Our panel of IBM i experts—Chuck Losinski, Robin Tatam, Richard Schoen, and Tom Huntington—will outline strategies that allow your company to cope with IBM i skills depletion by adopting these strategies that allow you to get the job done without deep expertise on the OS:
    - Automate IBM i processes
    - Use managed services to help fill the gaps
    - Secure the system against data loss and viruses
    The strategies you discover in this webinar will help you ensure that your system of record—your IBM i—continues to deliver a powerful business advantage, even as staff retires.

     

  • Backup and Recovery Considerations for Security Data and Encrypted Backups

    SB PowerTech WC GenericSecurity expert Carol Woodbury is joined by Debbie Saugen. Debbie is an expert on IBM i backup and recovery, disaster recovery, and high availability, helping IBM i shops build and implement effective business continuity plans.
    In today’s business climate, business continuity is more important than ever. But 83 percent of organizations are not totally confident in their backup strategy.
    During this webinar, Carol and Debbie discuss the importance of a good backup plan, how to ensure you’re backing up your security information, and your options for encrypted back-ups.

  • Profound.js: The Agile Approach to Legacy Modernization

    SB Profound WC GenericIn this presentation, Alex Roytman and Liam Allan will unveil a completely new and unique way to modernize your legacy applications. Learn how Agile Modernization:
    - Uses the power of Node.js in place of costly system re-writes and migrations
    - Enables you to modernize legacy systems in an iterative, low-risk manner
    - Makes it easier to hire developers for your modernization efforts
    - Integrates with Profound UI (GUI modernization) for a seamless, end-to-end legacy modernization solution

     

  • Data Breaches: Is IBM i Really at Risk?

    SB PowerTech WC GenericIBM i is known for its security, but this OS could be more vulnerable than you think.
    Although Power Servers often live inside the safety of the perimeter firewall, the risk of suffering a data leak or data corruption remains high.
    Watch noted IBM i security expert Robin Tatam as he discusses common ways that this supposedly “secure” operating system may actually be vulnerable and who the culprits might be.

    Watch the webinar today!

     

  • Easy Mobile Development

    SB Profound WC GenericWatch this on-demand webinar and learn how to rapidly and easily deploy mobile apps to your organization – even when working with legacy RPG code! IBM Champion Scott Klement will demonstrate how to:
    - Develop RPG applications without mobile development experience
    - Deploy secure applications for any mobile device
    - Build one application for all platforms, including Apple and Android
    - Extend the life and reach of your IBM i (aka iSeries, AS400) platform
    You’ll see examples from customers who have used our products and services to deliver the mobile applications of their dreams, faster and easier than they ever thought possible!

     

  • Profound UI: Unlock True Modernization from your IBM i Enterprise

    SB Profound PPL 5491Modern, web-based applications can make your Enterprise more efficient, connected and engaged. This session will demonstrate how the Profound UI framework is the best and most native way to convert your existing RPG applications and develop new modern applications for your business. Additionally, you will learn how you can address modernization across your Enterprise, including databases and legacy source code, with Profound Logic.

  • Node Webinar Series Pt. 1: The World of Node.js on IBM i

    Profound Logic Software, Inc.Have you been wondering about Node.js? Our free Node.js Webinar Series takes you from total beginner to creating a fully-functional IBM i Node.js business application.

    Part 1 will teach you what Node.js is, why it's a great option for IBM i shops, and how to take advantage of the ecosystem surrounding Node.

    In addition to background information, our Director of Product Development Scott Klement will demonstrate applications that take advantage of the Node Package Manager (npm).

  • 5 New and Unique Ways to Use the IBM i Audit Journal

    SB HelpSystems ROBOT GenericYou must be asking yourself: am I doing everything I can to protect my organization’s data? Tune in as our panel of IBM i high availability experts discuss:


    - Why companies don’t test role swaps when they know they should
    - Whether high availability in the cloud makes sense for IBM i users
    - Why some organizations don’t have high availability yet
    - How to get high availability up and running at your organization
    - High availability considerations for today’s security concerns

  • Profound.js 2.0: Extend the Power of Node to your IBM i Applications

    SB Profound WC 5541In this Webinar, we'll demonstrate how Profound.js 2.0 enables you to easily adopt Node.js in your business, and to take advantage of the many benefits of Node, including access to a much larger pool of developers for IBM i and access to countless reusable open source code packages on npm (Node Package Manager).
    You will see how Profound.js 2.0 allows you to:

    • Provide RPG-like capabilities for server-side JavaScript.
    • Easily create web and mobile application interfaces for Node on IBM i.
    • Let existing RPG programs call Node.js modules directly, and vice versa.
    • Automatically generate code for Node.js.
    • Automatically converts existing RPGLE code into clean, simplified Node.js code.

    Download and watch today!

     

  • Make Modern Apps You'll Love with Profound UI & Profound.js

    SB Profound WC 5541Whether you have green screens or a drab GUI, your outdated apps can benefit from modern source code, modern GUIs, and modern tools.
    Profound Logic's Alex Roytman and Liam Allan are here to show you how Free-format RPG and Node.js make it possible to deliver applications your whole business will love:

    • Transform legacy RPG code to modern free-format RPG and Node.js
    • Deliver truly modern application interfaces with Profound UI
    • Extend your RPG applications to include Web Services and NPM packages with Node.js

     

  • Accelerating Programmer Productivity with Sequel

    SB_HelpSystems_WC_Generic

    Most business intelligence tools are just that: tools, a means to an end but not an accelerator. Yours could even be slowing you down. But what if your BI tool didn't just give you a platform for query-writing but also improved programmer productivity?
    Watch the recorded webinar to see how Sequel:

    • Makes creating complex results simple
    • Eliminates barriers to data sources
    • Increases flexibility with data usage and distribution

    Accelerated productivity makes everyone happy, from programmer to business user.

  • Business Intelligence is Changing: Make Your Game Plan

    SB_HelpSystems_WC_GenericIt’s time to develop a strategy that will help you meet your informational challenges head-on. Watch the webinar to learn how to set your IT department up for business intelligence success. You’ll learn how the right data access tool will help you:

    • Access IBM i data faster
    • Deliver useful information to executives and business users
    • Empower users with secure data access

    Ready to make your game plan and finally keep up with your data access requests?

     

  • Controlling Insider Threats on IBM i

    SB_HelpSystems_WC_GenericLet’s face facts: servers don’t hack other servers. Despite the avalanche of regulations, news headlines remain chock full of stories about data breaches, all initiated by insiders or intruders masquerading as insiders.
    User profiles are often duplicated or restored and are rarely reviewed for the appropriateness of their current configuration. This increases the risk of the profile being able to access data without the intended authority or having privileges that should be reserved for administrators.
    Watch security expert Robin Tatam as he discusses a new approach for onboarding new users on IBM i and best-practices techniques for managing and monitoring activities after they sign on.

  • Don't Just Settle for Query/400...

    SB_HelpSystems_WC_GenericWhile introducing Sequel Data Access, we’ll address common frustrations with Query/400, discuss major data access, distribution trends, and more advanced query tools. Plus, you’ll learn how a tool like Sequel lightens IT’s load by:

    - Accessing real-time data, so you can make real-time decisions
    - Providing run-time prompts, so users can help themselves
    - Delivering instant results in Microsoft Excel and PDF, without the wait
    - Automating the query process with on-demand data, dashboards, and scheduled jobs

  • How to Manage Documents the Easy Way

    SB_HelpSystems_WC_GenericWhat happens when your company depends on an outdated document management strategy?
    Everything is harder.
    You don’t need to stick with status quo anymore.
    Watch the webinar to learn how to put effective document management into practice and:

    • Capture documents faster, instead of wasting everyone’s time
    • Manage documents easily, so you can always find them
    • Distribute documents automatically, and move on to the next task

     

  • Lessons Learned from the AS/400 Breach

    SB_PowerTech_WC_GenericGet actionable info to avoid becoming the next cyberattack victim.
    In “Data breach digest—Scenarios from the field,” Verizon documented an AS/400 security breach. Whether you call it AS/400, iSeries, or IBM i, you now have proof that the system has been breached.
    Watch IBM i security expert Robin Tatam give an insightful discussion of the issues surrounding this specific scenario.
    Robin will also draw on his extensive cybersecurity experience to discuss policies, processes, and configuration details that you can implement to help reduce the risk of your system being the next victim of an attack.

  • Overwhelmed by Operating Systems?

    SB_HelpSystems_WC_GenericIn this 30-minute recorded webinar, our experts demonstrate how you can:

    • Manage multiple platforms from a central location
    • View monitoring results in a single pane of glass on your desktop or mobile device
    • Take advantage of best practice, plug-and-play monitoring templates
    • Create rules to automate daily checks across your entire infrastructure
    • Receive notification if something is wrong or about to go wrong

    This presentation includes a live demo of Network Server Suite.

     

  • Real-Time Disk Monitoring with Robot Monitor

    SB_HelpSystems_WC_GenericYou need to know when IBM i disk space starts to disappear and where it has gone before system performance and productivity start to suffer. Our experts will show you how Robot Monitor can help you pinpoint exactly when your auxiliary storage starts to disappear and why, so you can start taking a proactive approach to disk monitoring and analysis. You’ll also get insight into:

    • The main sources of disk consumption
    • How to monitor temporary storage and QTEMP objects in real time
    • How to monitor objects and libraries in real time and near-real time
    • How to track long-term disk trends

     

     

  • Stop Re-keying Data Between IBM I and Other Applications

    SB_HelpSystems_WC_GenericMany business still depend on RPG for their daily business processes and report generation.Wouldn’t it be nice if you could stop re-keying data between IBM i and other applications? Or if you could stop replicating data and start processing orders faster? Or what if you could automatically extract data from existing reports instead of re-keying? It’s all possible. Watch this webinar to learn about:

    • The data dilemma
    • 3 ways to stop re-keying data
    • Data automation in practice

    Plus, see how HelpSystems data automation software will help you stop re-keying data.

     

  • The Top Five RPG Open Access Myths....BUSTED!

    SB_Profound_WC_GenericWhen it comes to IBM Rational Open Access: RPG Edition, there are still many misconceptions - especially where application modernization is concerned!

    In this Webinar, we'll address some of the biggest myths about RPG Open Access, including:

    • Modernizing with RPG OA requires significant changes to the source code
    • The RPG language is outdated and impractical for modernizing applications
    • Modernizing with RPG OA is the equivalent to "screen scraping"

     

  • Time to Remove the Paper from Your Desk and Become More Efficient

    SB_HelpSystems_WC_GenericToo much paper is wasted. Attempts to locate documents in endless filing cabinets.And distributing documents is expensive and takes up far too much time.
    These are just three common reasons why it might be time for your company to implement a paperless document management system.
    Watch the webinar to learn more and discover how easy it can be to:

    • Capture
    • Manage
    • And distribute documents digitally

     

  • IBM i: It’s Not Just AS/400

    SB_HelpSystems_WC_Generic

    IBM’s Steve Will talks AS/400, POWER9, cognitive systems, and everything in between

    Are there still companies that use AS400? Of course!

    IBM i was built on the same foundation.
    Watch this recorded webinar with IBM i Chief Architect Steve Will and IBM Power Champion Tom Huntington to gain a unique perspective on the direction of this platform, including:

    • IBM i development strategies in progress at IBM
    • Ways that Watson will shake hands with IBM i
    • Key takeaways from the AS/400 days

     

  • Ask the RDi Experts

    SB_HelpSystems_WC_GenericWatch this recording where Jim Buck, Susan Gantner, and Charlie Guarino answered your questions, including:

    • What are the “hidden gems” in RDi that can make me more productive?
    • What makes RDi Debug better than the STRDBG green screen debugger?
    • How can RDi help me find out if I’ve tested all lines of a program?
    • What’s the best way to transition from PDM to RDi?
    • How do I convince my long-term developers to use RDi?

    This is a unique, online opportunity to hear how you can get more out of RDi.

     

  • Node.js on IBM i Webinar Series Pt. 2: Setting Up Your Development Tools

    Profound Logic Software, Inc.Have you been wondering about Node.js? Our free Node.js Webinar Series takes you from total beginner to creating a fully-functional IBM i Node.js business application. In Part 2, Brian May teaches you the different tooling options available for writing code, debugging, and using Git for version control. Attend this webinar to learn:

    • Different tools to develop Node.js applications on IBM i
    • Debugging Node.js
    • The basics of Git and tools to help those new to it
    • Using NodeRun.com as a pre-built development environment

     

     

  • Inside the Integrated File System (IFS)

    SB_HelpSystems_WC_GenericDuring this webinar, you’ll learn basic tips, helpful tools, and integrated file system commands—including WRKLNK—for managing your IFS directories and Access Client Solutions (ACS). We’ll answer your most pressing IFS questions, including:

    • What is stored inside my IFS directories?
    • How do I monitor the IFS?
    • How do I replicate the IFS or back it up?
    • How do I secure the IFS?

    Understanding what the integrated file system is and how to work with it must be a critical part of your systems management plans for IBM i.

     

  • Expert Tips for IBM i Security: Beyond the Basics

    SB PowerTech WC GenericIn this session, IBM i security expert Robin Tatam provides a quick recap of IBM i security basics and guides you through some advanced cybersecurity techniques that can help you take data protection to the next level. Robin will cover:

    • Reducing the risk posed by special authorities
    • Establishing object-level security
    • Overseeing user actions and data access

    Don't miss this chance to take your knowledge of IBM i security beyond the basics.

     

     

  • 5 IBM i Security Quick Wins

    SB PowerTech WC GenericIn today’s threat landscape, upper management is laser-focused on cybersecurity. You need to make progress in securing your systems—and make it fast.
    There’s no shortage of actions you could take, but what tactics will actually deliver the results you need? And how can you find a security strategy that fits your budget and time constraints?
    Join top IBM i security expert Robin Tatam as he outlines the five fastest and most impactful changes you can make to strengthen IBM i security this year.
    Your system didn’t become unsecure overnight and you won’t be able to turn it around overnight either. But quick wins are possible with IBM i security, and Robin Tatam will show you how to achieve them.

  • How to Meet the Newest Encryption Requirements on IBM i

    SB PowerTech WC GenericA growing number of compliance mandates require sensitive data to be encrypted. But what kind of encryption solution will satisfy an auditor and how can you implement encryption on IBM i? Watch this on-demand webinar to find out how to meet today’s most common encryption requirements on IBM i. You’ll also learn:

    • Why disk encryption isn’t enough
    • What sets strong encryption apart from other solutions
    • Important considerations before implementing encryption

     

     

  • Security Bulletin: Malware Infection Discovered on IBM i Server!

    SB PowerTech WC GenericMalicious programs can bring entire businesses to their knees—and IBM i shops are not immune. It’s critical to grasp the true impact malware can have on IBM i and the network that connects to it. Attend this webinar to gain a thorough understanding of the relationships between:

    • Viruses, native objects, and the integrated file system (IFS)
    • Power Systems and Windows-based viruses and malware
    • PC-based anti-virus scanning versus native IBM i scanning

    There are a number of ways you can minimize your exposure to viruses. IBM i security expert Sandi Moore explains the facts, including how to ensure you're fully protected and compliant with regulations such as PCI.

     

     

  • Fight Cyber Threats with IBM i Encryption

    SB PowerTech WC GenericCyber attacks often target mission-critical servers, and those attack strategies are constantly changing. To stay on top of these threats, your cybersecurity strategies must evolve, too. In this session, IBM i security expert Robin Tatam provides a quick recap of IBM i security basics and guides you through some advanced cybersecurity techniques that can help you take data protection to the next level. Robin will cover:

    • Reducing the risk posed by special authorities
    • Establishing object-level security
    • Overseeing user actions and data access

     

     

     

  • 10 Practical IBM i Security Tips for Surviving Covid-19 and Working From Home

    SB PowerTech WC GenericNow that many organizations have moved to a work from home model, security concerns have risen.

    During this session Carol Woodbury will discuss the issues that the world is currently seeing such as increased malware attacks and then provide practical actions you can take to both monitor and protect your IBM i during this challenging time.

     

  • How to Transfer IBM i Data to Microsoft Excel

    SB_HelpSystems_WC_Generic3 easy ways to get IBM i data into Excel every time
    There’s an easy, more reliable way to import your IBM i data to Excel? It’s called Sequel. During this webinar, our data access experts demonstrate how you can simplify the process of getting data from multiple sources—including Db2 for i—into Excel. Watch to learn how to:

    • Download your IBM i data to Excel in a single step
    • Deliver data to business users in Excel via email or a scheduled job
    • Access IBM i data directly using the Excel add-in in Sequel

    Make 2020 the year you finally see your data clearly, quickly, and securely. Start by giving business users the ability to access crucial business data from IBM i the way they want it—in Microsoft Excel.

     

     

  • HA Alternatives: MIMIX Is Not Your Only Option on IBM i

    SB_HelpSystems_WC_GenericIn this recorded webinar, our experts introduce you to the new HA transition technology available with our Robot HA software. You’ll learn how to:

    • Transition your rules from MIMIX (if you’re happy with them)
    • Simplify your day-to-day activities around high availability
    • Gain back time in your work week
    • Make your CEO happy about reducing IT costs

    Don’t stick with a legacy high availability solution that makes you uncomfortable when transitioning to something better can be simple, safe, and cost-effective.

     

     

  • Comply in 5! Well, actually UNDER 5 minutes!!

    SB CYBRA PPL 5382

    TRY the one package that solves all your document design and printing challenges on all your platforms.

    Produce bar code labels, electronic forms, ad hoc reports, and RFID tags – without programming! MarkMagic is the only document design and print solution that combines report writing, WYSIWYG label and forms design, and conditional printing in one integrated product.

    Request your trial now!

  • Backup and Recovery on IBM i: Your Strategy for the Unexpected

    SB HelpSystems SC 5413Robot automates the routine tasks of iSeries backup and recovery, saving you time and money and making the process safer and more reliable. Automate your backups with the Robot Backup and Recovery Solution. Key features include:
    - Simplified backup procedures
    - Easy data encryption
    - Save media management
    - Guided restoration
    - Seamless product integration
    Make sure your data survives when catastrophe hits. Try the Robot Backup and Recovery Solution FREE for 30 days.

  • Manage IBM i Messages by Exception with Robot

    SB HelpSystems SC 5413Managing messages on your IBM i can be more than a full-time job if you have to do it manually. How can you be sure you won’t miss important system events?
    Automate your message center with the Robot Message Management Solution. Key features include:
    - Automated message management
    - Tailored notifications and automatic escalation
    - System-wide control of your IBM i partitions
    - Two-way system notifications from your mobile device
    - Seamless product integration
    Try the Robot Message Management Solution FREE for 30 days.

  • Easiest Way to Save Money? Stop Printing IBM i Reports

    SB HelpSystems SC 5413Robot automates report bursting, distribution, bundling, and archiving, and offers secure, selective online report viewing.
    Manage your reports with the Robot Report Management Solution. Key features include:

    - Automated report distribution
    - View online without delay
    - Browser interface to make notes
    - Custom retention capabilities
    - Seamless product integration
    Rerun another report? Never again. Try the Robot Report Management Solution FREE for 30 days.

  • Hassle-Free IBM i Operations around the Clock

    SB HelpSystems SC 5413For over 30 years, Robot has been a leader in systems management for IBM i.
    Manage your job schedule with the Robot Job Scheduling Solution. Key features include:
    - Automated batch, interactive, and cross-platform scheduling
    - Event-driven dependency processing
    - Centralized monitoring and reporting
    - Audit log and ready-to-use reports
    - Seamless product integration
    Scale your software, not your staff. Try the Robot Job Scheduling Solution FREE for 30 days.

  • ACO MONITOR Manages your IBM i 24/7 and Notifies You When Your IBM i Needs Assistance!

    SB DDL Systems 5429More than a paging system - ACO MONITOR is a complete systems management solution for your Power Systems running IBM i. ACO MONITOR manages your Power System 24/7, uses advanced technology (like two-way messaging) to notify on-duty support personnel, and responds to complex problems before they reach critical status.

    ACO MONITOR is proven technology and is capable of processing thousands of mission-critical events daily. The software is pre-configured, easy to install, scalable, and greatly improves data center efficiency.